Sunday, October 30, 2011

MS Paint Demolition Update!

Real quick post of what we have left to do and what we've gotten rid of.



The Red shows what's been removed. The X or short lines
and partial X show where the ceiling is completely removed or
Partially removed. The red lines making up the small room show
that the room, studs and all are gone. We have one and a half ceilings left with
Plaster to remove 1 Full wall to take down. And then the kitchen and bathroom to strip and gut.
No plaster in those two rooms so it makes it a piece of cake. Oh and the 2 chimney's left.

The house is 75% complete with demolition. By Monday of NEXT Week November 7th the Entire house should be 98% gutted clean down to the basement and from there we start taking down the chimney's to have them complete by November 19th. (that's shooting long)

The clean up process of dusting down the walls, removing the slat board nails and sweeping everything so it's free of the black soot dirt, blow in insulation, and all around dirt should be finished before the 26th of November. After that we start Putting her back together again. So December we're hoping to have as the Month of adding Pex, wiring, insulation, new sub floor, and drywall.

Here's hoping we stay on task and schedule,
Mallow 